No |
PROJECTS |
END USER |
LOCATION |
SCOPE OF SERVICE |
YEAR |
STATUS |
31 |
SUPPLY ENGINEERING |
PT. FREEPORT INDONESIA |
PAPUA |
ENGINEERING SERVICE MAINTENANCE AND REPAIR |
2019 |
COMPLETED |
32 |
ROBOT WELDING SYSTEM |
PT. TOYOTA BOSHOKU INDONESIA (TBINA) |
CIBITUNG |
ROBOT WELDING SYSTEM CONTROL PANEL |
2018 |
COMPLETED |
33 |
DEMINERALIZER PLANT |
PT. CENTRAL MOTOR WHEEL INDOENSIA |
PASURUAN |
MOTOR CONTROL CENTRE (MCC) PANEL |
2018 |
COMPLETED |
34 |
WASTE WATER TREATMENT PLANT |
PT. INDOKUAT |
CIKARANG |
MOTOR CONTROL CENTRE (MCC) PANEL |
2018 |
COMPLETED |
35 |
BACKUP POWER FOR BTS TOWER |
PT. KOMET INFRA NUSANTARA |
SUMATRA AREA (SUMBAGSEL) |
PACKAGE CONTROL PANEL AND ENGINEERING |
2016 |
COMPLETED |
36 |
DEMINERALIZED PLANT |
PT. UNITED CAN COMPANY |
JAKARTA |
MOTOR CONTROL CENTRE (MCC) PANEL |
2016 |
COMPLETED |
37 |
DISOLVED OXYGEN SYSTEM FO AERATION TANK |
EJIP |
JAKARTA |
MOTOR CONTROL CENTRE (MCC) PANEL |
2015 |
COMPLETED |
38 |
ULTRA FILTRATION SYSTEM |
PT. INDOMINA LANGGENG SEJAHTERA |
LAMPUNG |
SUPPLY PLC AND ENGINEERING SERVICES |
2014/td> |
COMPLETED |
39 |
REFURBISHED CONTROL SYSTEM FOR FILTER |
PT. AETRA JAKARTA |
JAKARTA |
SUPPLY PLC AND ENGINEERING SERVICES |
2014 |
COMPLETED |
40 |
MIXBED SYSTEM |
PT. ASTRA HONDA MOTOR |
CIBITUNG |
MOTOR CONTROL CENTRE (MCC) PANEL |
2014 |
COMPLETED |